What Is System Integration in Machine Electrification?

System integration in machine electrification is the work that makes the battery, motors, inverters, controls, cooling, high-voltage system and the machine itself operate as one complete system.

It begins before components are selected and continues through commissioning, testing and field support.

Why System Integration in Machine Electrification Matters

Every major component in an electric powertrain can meet its own specification and the machine can still fall short as a system.

The battery may deliver the required energy but not support the intended charging schedule. The motor and inverter may be correctly rated but poorly matched to the duty cycle. A cooling circuit may work in isolation but compete for space with hydraulic lines, high-voltage cables or service access.

These are not necessarily component failures. They are system-level problems created by the way requirements, components, interfaces and engineering teams interact.

A component supplier knows its own product. The OEM knows the machine and its application. System integration connects those areas of expertise and turns the individual parts into a machine that performs as intended. Whether the OEM has the internal capability to carry this work through is a separate question, covered in the electrification readiness guide for OEMs.

What System Integration Brings Together

System integration is broader than connecting electrical components. It covers the decisions and practical constraints that affect the complete machine.

Integration areaWhat must work together
Machine requirementsDuty cycle, loads, operating environment and charging infrastructure
PowertrainBattery, motors, inverters, voltage level and charging
Physical integrationPackaging, cooling, hydraulics, cabling and service access
Controls and communicationSoftware, component communication, diagnostics and machine control
Safety and validationHigh-voltage safety, EMC, commissioning and system testing
Field operationServiceability, operational data, feedback and further development

An engineering decision rarely affects only one row. Changing a battery can alter weight distribution, installation space, cooling demand, cable routing, charging time and control logic. Integration makes those connections visible before they become changes to a finished prototype.

From Machine Requirements to Field Support

System integration runs through the complete electrification project.

  1. Understand the operating requirement. Duty-cycle data, loads, working patterns, ambient conditions and charging opportunities establish what the machine needs.
  2. Define the system architecture. The team decides how energy is stored, distributed and used, as well as the voltage level, charging approach and main system interfaces. (Read more: What Is Powertrain Architecture?)
  3. Select and coordinate the components. Batteries, motors, inverters, charging equipment and power distribution are selected as parts of the architecture rather than as isolated purchases. (Read more: how to choose components that work as one system)
  4. Integrate mechanics, electrics, hydraulics and software. These areas are developed in parallel because their decisions constrain one another.
  5. Commission and test the complete machine. Electrical safety measurements, parametrisation and operational tuning confirm not only that the parts work, but that the machine behaves as intended. (Read more: commissioning, testing and HV safety validation)
  6. Learn from field operation. Data and user feedback show where controls, efficiency, diagnostics or service procedures can improve. (Read more: lifetime support with diagnostics, software updates and training)

Future variants also matter. Considering modularity, component availability and charging infrastructure early can reduce redesign in later machine generations.

Whole-System Responsibility Needs a Clear Owner

Electrification projects involve several suppliers and engineering teams. Suppliers are responsible for their own deliveries, while the OEM remains the machine specialist. That still leaves one question: who is responsible for the complete system?

With one clear owner, questions that fall between suppliers and engineering teams have somewhere to go. A thermal question that touches the battery supplier, cooling design and machine packaging is solved as one issue. Behaviour that involves an inverter parameter, control software and hydraulics is traced across all three, so the performance of the whole machine stays in focus.

The integrator coordinates these boundaries, makes system-level trade-offs visible and remains accountable for the technical result. This complements the OEM’s expertise and gives the shared work a clear system-level owner. You can bring in hybrid and electric powertrain integration services for a specific engineering task or the whole project, from early assessment to commissioning and support.

Who brings what

OEM team
  • The machine and how it is used
  • Packaging and base systems
Integration partner
  • Experience across many subsystems
  • Bringing them together into one working whole

The split varies by project.

Who brings what

OEM team
  • The machine and how it is used
  • Packaging and base systems
Integration partner
  • Experience across many subsystems
  • Bringing them together into one working whole

The split varies by project.

Serviceability Is Part of System Integration

A machine is not fully integrated if it performs well but is unnecessarily difficult to maintain.

A service point that looks accessible in CAD can become difficult to reach once cables, hydraulic lines, cooling hoses and surrounding structures are installed. A small packaging decision can then affect every service visit throughout the machine’s working life.

Designed in from the start

  • Installation order
  • Tool access
  • Diagnostics
  • Replaceable components
  • Safe isolation

Serviceability is decided before the layout is fixed.

Field experience therefore matters during design. Installation order, tool access, diagnostics, replaceable components and safe isolation need consideration before the layout is fixed. Serviceability is not a finishing detail. It is an outcome of a well-integrated system.

Designed in from the start

  • Installation order
  • Tool access
  • Diagnostics
  • Replaceable components
  • Safe isolation

Serviceability is decided before the layout is fixed.

A Practical System Integration Checklist

  • Are the requirements based on real operating data?
  • Was the architecture defined before component selection?
  • Is one team responsible for the whole-system result?
  • Are mechanical, electrical, hydraulic and software teams working together?
  • Can major components be inspected or replaced without rebuilding the surrounding system?
  • Have diagnostics, safe isolation and field maintenance been considered?

If several of these are still open, that is exactly where an integrator can help.

Expert insights from
Ville Eskelinen
Ville EskelinenCo-Founder and CEO, Hevtec
Heikki Hakala
Heikki HakalaCo-Founder and CTO, Hevtec
TÜV SÜD Functional Safety Professional

How to get started with an integrator

If you are planning an electric or hybrid machine, the most useful starting point is a conversation about the machine, its operating requirements and the decisions already made.

System Integration in Machine Electrification FAQ

Do I need an integrator if I already have electrification engineers?

An integrator can work alongside your electrification engineers, contributing experience from other applications and supporting specific parts of the project. The scope depends on your team’s strengths and the work ahead. This experience can help the team assess component combinations and interfaces against the requirements of your machine.

Because system level design comes first, and component selection must support it rather than drive it. A manufacturer can confirm that a part meets its own specification, but not that it works within your machine’s duty cycle, environment, and the rest of the powertrain. The integrator owns that system level responsibility. 

As early as the first architecture decisions. The earlier an integrator understands the OEM’s wider electrification roadmap, the better they can design a modular and scalable powertrain that anticipates future machines and evolving infrastructure. Bringing them in late limits how much of that thinking can still be built into the design.