Nasta

ZE690 Grid-Battery Electric

Engineering a 70-Tonne Grid-Battery Excavator

Sometimes it’s the size that counts.

The 70-tonne excavator is based on a Hitachi ZX690LCH-7 and adapted to Nasta’s PeakShaver+ concept. As an NRMM electrification partner, Hevtec engineered the machine-level integration of battery and grid power into one controlled system.

Drivetrain

Battery electric, grid-hybrid

Energy storage

297 kWh

Electric power

375 kW

Motor solution

ABB M3LP 315KHC 4

Inverter solution

ABB HES880

Charging solution

ABB HES880

Charge power (AC/DC)

300 kW

Charge time 0-80% (AC/DC)

~45 min

Weight

71 400 kg

The Starting Point

The contractor needed a 70-tonne electric excavator that could operate from the grid while retaining enough battery capacity for cable-free movement and peak power support.

Nasta’s conversion of the Hitachi ZX690LCH-7 provided the right platform for the solution.

According to Jostein Ytreland, Chief Engineer at Vassbakk & Stol, the machine’s 1,000 V system and 300 kWh onboard battery provide the flexibility needed for rigging and cable-free movement. Through PeakShaver+, the battery also acts as a buffer for the power grid.

Jostein Ytreland

Chief Engineer at Vassbakk & Stol

How PeakShaver+ Works

PeakShaver+ combines grid power with onboard battery capacity. The machine can operate on battery power for approximately one hour, allowing cable-free movement between power points and during loading for transport.

When connected to the grid, the battery supports the machine during power peaks. Depending on the available grid connection, the cable supplies 60–100% of the required power, while the battery provides the remainder.

Hevtec Control System features used in this project:

  • Intelligent power and energy management
  • Multiple energy source management
  • Cabin, battery system and power electronics thermal management
  • Data logging and edge computing
  • Auxiliary system control
  • Charge control
  • Touch-screen GUI 

The Result: Heavy-Duty Operation at Rogfast

The first ZE690 was delivered to Vassbakk & Stol in December 2024 for the Rogfast project. At Arsvågen, it handles rock from an intermediate stockpile and loads it onto barges for onward transport.

“The machine will go on the Rogfast project, on an intermediate stockpile of stone at Arsvågen. Here it will handle loading rock masses onto barges for onward sea transport. Up until now, loading has been done electrically on barges with front-end excavators, but due to the range and capacity, handling of intermediate stockpile will require a back-end excavator solution of this size.”

Electrification Built Through Collaboration

The ZE690 was developed through close cooperation between Nasta, Vassbakk & Stol and the project partners. For Nasta, it is the largest electric machine delivered to date.